Hi, Need Help

Discussions – 4

Activity – 1

Problem set – 1 

Assignment – 1

PFA for 

Project Management Process – PPT (Chapters 5,6)

Managerial Economics – PPT (Chapters 15, 16)

ACTIVITY 1 – PROJECT MANAGEMENT PROCESSES

Activity I:

Epidemiological data indicate that only a handful of patients have contracted the AIDS (Acquired Immune Deficiency Syndrome) virus from health care workers. Many, though have called for the periodic testing of all health care workers in an effort to protect or at least reduce the risks to the public:

· Identify the costs and benefits associated with such a program.

· Develop an implementation plan for nationwide testing.

· How would you go about measuring the costs of the plan?

· What are the costs and risks of not testing?

The assignment should be 1.5 – 2 pages long, and in APA format (including Times New Roman with font size 12 and double spaced). It should be pasted on the assignment board and also attached as a WORD file.

Activity II:

Using MAUT and the AHP, perform a 3-level hierarchical graphical model to analyze and select a graduate program.

Explain your assumptions and indicate which technique you believe is most appropriate for this application. (Figures 6.2 and 6.8 from the course textbook may help).

Although this activity is primarily graphic based, you may use the following additional instructions as needed: Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length. For all verbiage, use Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized. Do not insert excess line spacing. APA formatting and citation should be used.

TEXT BOOK:

Title: Project Management

ISBN: 9780134478661

Authors: SHTUB

Publisher: Pearson

Edition: 3RD 17